Sainte-Thérèse High School

Boulevard du Domaine, Sainte-Thérèse

Project Summary

Cost
12 274 000$
Execution period
2019-2020
Type of contract
Contract
Client
CSSSMI
Architecture
DKA
Landscape Architect
BMA
Structural Engineering
Cima+
Mechanical Engineering
Cima+
Civil Engineering
Cima+
Electrical Engineering
Cima+

Présentation

Replacement of the swimming pool with a new 1,030 sq.m. multidisciplinary sport center. Mechanical system characterized by geothermal wells to minimize energy costs. Building erected in cohabitation with the occupants of the existing high school. Refurbishment of the parking lots with the addition of outdoor sports equipment.

Similar Projects

  1. Collège Lionel-Groulx

    Rue Duquet, Sainte-Thérèse
  2. Très-Saint-Sacrement School

    Rue Provost, Lachine

Make a Difference Every Day

Feeling that our thoughts, our ideas, our solutions make a difference is stimulating and energizing, isn’t it? We feel like going beyond limits, giving more, and reinventing ourselves constantly. At Tisseur, we create projects for the future, and a future jewel of Quebec. Does this vision appeal to you? Embark on this great adventure!

Find out more