Saint-Hippolyte School
111e Avenue, Saint-Hippolyte![](https://tisseur.com/en/realisations/ecole-saint-hippolyte/1T18-020.2-e1566781226437_hu8876debe093ed1e543a4d7d47663cb04_350098_0x1080_resize_q90_box.jpg)
Project Summary
- Cost
- 15 900 000$
- Execution period
- 2018-2019
- Type of contract
- Contract
- Client
- CSSRDN
- Architecture
- BBBL+HZDS
- Landscape Architect
- Relief Design
- Structural Engineering
- Cima+
- Mechanical Engineering
- GBi
- Civil Engineering
- Cima+
- Electrical Engineering
- GBi
Présentation
Construction of a new 4,270 sq.m. elementary school on 2 levels. The building consists of 3 kindergarten classes, 18 elementary classes and 2 gymnasiums. Mechanical system characterized by geothermal wells to minimise energy costs. The structure is made of conventional steel frame. The school is built on a land composed mainly of rock. Landscaped lot with 61 parking spaces, car and bus landing and a 4,700 sq.m. school playground.
![](https://tisseur.com/en/realisations/ecole-saint-hippolyte/2T18-020.5-e1566781281727_hu0042efeb41cae8f316462c47b71e3c74_439245_0x1080_resize_q90_box.jpg)
![](https://tisseur.com/en/realisations/ecole-saint-hippolyte/T18-020.1-e1566781239455_hu2454aee48a8c4a6678e1ff851e17a7d0_379421_0x1080_resize_q90_box.jpg)
![](https://tisseur.com/en/realisations/ecole-saint-hippolyte/T18-020.3-e1566781251888_hu3c5a4e23fbd639653609a27baa7a4baa_373281_0x1080_resize_q90_box.jpg)
![](https://tisseur.com/en/realisations/ecole-saint-hippolyte/T18-020.4-e1566781265604_hud65c190dede543c61a0d2a1ebc4ca933_299808_0x1080_resize_q90_box.jpg)