Immigration Holding Centre

Montée Saint-François, Laval

Project Summary

Cost
49 600 000$
Execution period
2019-2021
Type of contract
Contract
Client
Public Works and Government Services Canada
Architecture
Lemay
Landscape Architect
Lemay
Structural Engineering
Stantec
Mechanical Engineering
Stantec
Civil Engineering
Stantec
Electrical Engineering
Stantec

Présentation

Construction of a new 2-storey 8,260 sq.m. immigration monitoring centre. The building consists of bedrooms, récollection room, multipurpose room, common area, library and reading area, teaching and craft room and several other rooms to enfance the occupants’ stay. Mechanical system characterized by geothermal wells to minimize energy costs. The building structure consists of a conventional steel frame. Landscaped lot with 136 parking spaces, a service area at the back for deliveries as well as several interior courtyards with amenities for the residents.

Similar Projects

  1. Laurentien Hospital - Addition of 25 beds (lot 1)

    Rue Saint-Vincent, Sainte-Agathe-des-Monts
  2. Pierrefonds-Roxboro Aquatic and Recreational Complex

    Boulevard De Pierrefonds, Pierrefonds
  3. Saint-Philippe wastewater treatment plant

    Route 217, Saint-Philippe

Make a Difference Every Day

Feeling that our thoughts, our ideas, our solutions make a difference is stimulating and energizing, isn’t it? We feel like going beyond limits, giving more, and reinventing ourselves constantly. At Tisseur, we create projects for the future, and a future jewel of Quebec. Does this vision appeal to you? Embark on this great adventure!

Find out more