Road Transportation Training Centre
Rue Aubin, MirabelProject Summary
- Cost
- 7 800 000$
- Execution period
- 2016-2017
- Type of contract
- Contract
- Client
- CSSRDN
- Architecture
- BBBL+TLa+Coursol Miron
- Structural Engineering
- Stantec
- Mechanical Engineering
- Beaudoin Hurens
- Civil Engineering
- Stantec
- Electrical Engineering
- Beaudoin Hurens
Présentation
A 2,800 sq.m. expansion of a professional training center spread on 2 levels. The building consists of 4 theoretical classes and several training workshops. Mechanical system characterized by geothermal wells to minimize energy costs. The building structure consists of a conventional steel frame. Landscaped lot with 22 spaces for heavy vehicles and 28 parking spaces.