Val-David Hyundai

Route 117, Val-David

Project Summary

Execution period
2018
Type of contract
Cost plus feeDesign, built
Client
JAL Ltée Automobiles
Architecture
TLA
Civil Engineering
Équipe Laurence

Présentation

Construction of a new 2,330 sq.m. car dealership spread over 2 levels. The building consists of a showroom for vehicles, a mechanic workshop and several administrative offices. Mechanical system characterized by geothermal wells to minimize energy costs. The building’s structure is made of conventional steel frame. Landscaped lot measuring 7,100 sq.m.

Similar Projects

  1. Ste-Agathe BMW & Mini

    Chemin de la Rivière, Ste-Agathe-des-Monts
  2. Sainte-Agathe Honda

    Route 117, Val-David 
  3. Excavation Martel Office

    Chemin de la Beauce, Beauharnois

Make a Difference Every Day

Feeling that our thoughts, our ideas, our solutions make a difference is stimulating and energizing, isn’t it? We feel like going beyond limits, giving more, and reinventing ourselves constantly. At Tisseur, we create projects for the future, and a future jewel of Quebec. Does this vision appeal to you? Embark on this great adventure!

Find out more