Du Ruisseau School

Avenue Villeneuve, St-Lin-des-Laurentides.

Project Summary

Cost
17 000 000$
Execution period
2017-2018
Type of contract
Contract
Client
CSSS
Architecture
B+B + Leclerc
Structural Engineering
Beaudoin Hurens
Mechanical Engineering
Ingémel + Bouthillette Parizeau
Civil Engineering
Beaudoin Hurens
Electrical Engineering
Ingémel + Bouthillette Parizeau

Présentation

Construction of a new 7,300 sq.m. elementary school on 2 levels. Building consisting of 5 kindergarten classes, 30 elementary classes and 3 gymnasiums. Mechanical system characterized by thermal wheels with heat recovery to minimize energy costs. Structure of the building consists of a conventional steel frame and a concrete foundation laid on driven piles. Building built on a lot composed mainly of rock. Landscaped lot with 95 parking spaces, car and bus landing and a 4,900 sq.m. school playground.

Similar Projects

  1. Saint-Hippolyte School

    111e Avenue, Saint-Hippolyte
  2. Road Transportation Training Centre

    Rue Aubin, Mirabel
  3. Des Blės-Dorės School

    Rue Pierre-Perrin, Mirabel

Make a Difference Every Day

Feeling that our thoughts, our ideas, our solutions make a difference is stimulating and energizing, isn’t it? We feel like going beyond limits, giving more, and reinventing ourselves constantly. At Tisseur, we create projects for the future, and a future jewel of Quebec. Does this vision appeal to you? Embark on this great adventure!

Find out more