Des Cascades School
Rue Albert, RawdonProject Summary
- Cost
- 15 500 000$
- Execution period
- 2018-2019
- Type of contract
- Contract
- Client
- CSS
- Architecture
- B+B + Leclerc
- Structural Engineering
- EXP
- Mechanical Engineering
- Bouthillette Parizeau
- Civil Engineering
- EXP
- Electrical Engineering
- Bouthillette Parizeau
Présentation
Construction of a new elementary school of 5,060 sq.m. spread over 2 levels. The building consists of 23 classes. Mechanical system characterized by thermal wheels with heat recovery to minimize energy costs. The structure of the building consists of a conventional steel frame and glulam (glue laminated wood) frame.