Nominingue Fire Station

Route 321, Nominingue

Project Summary

Cost
1 000 000$
Execution period
2014-2015
Type of contract
Contract
Client
Nominingue Township
Architecture
Pierre-Luc Beauregard
Mechanical Engineering
WSP
Civil Engineering
WSP
Electrical Engineering
WSP

Présentation

Construction of a new 650 sq.m. fire station on 2 levels. The building consists of an administrative area with basic amenities and a 6-door garage to receive the fire trucks. . Mechanical system characterized by a radiant floor to maximize the users’ Comfort. Electrical system equipped with a generator to enable the building to provide the continuity of essential services to the community during power outages. The structure of the building consists of a prefabricated frame. Landscaped grounds with an emergency exit for the fire safety vehicles.

Similar Projects

  1. STL Enlargement Phase 4

    Avenue Francis-Hughes, Laval
  2. Sainte-Marthe-sur-le-Lac Library

    Chemin d'Oka, Sainte-Marthe-sur-le-Lac
  3. Saint-Eustache Hospital

    Bd. Arthur-Sauvé, Saint-Eustache

Make a Difference Every Day

Feeling that our thoughts, our ideas, our solutions make a difference is stimulating and energizing, isn’t it? We feel like going beyond limits, giving more, and reinventing ourselves constantly. At Tisseur, we create projects for the future, and a future jewel of Quebec. Does this vision appeal to you? Embark on this great adventure!

Find out more