Wall of the Old Brewery
Boul. Saint-Joseph, MontréalProject Summary
- Cost
- 3 130 000$
- Execution period
- 2020-2021
- Type of contract
- Contract
- Client
- City of Montreal
- Structural Engineering
- SNC Lavalin
Présentation
The work consists of the demolition and reconstruction of a retaining wall along the Lac St-Louis on the site of the Old Brewery.