Point-du-Jour Service Area
Autoroute 40, LavaltrieProject Summary
- Cost
- 17 088 000$
- Execution period
- 2020-2021
- Type of contract
- Contract
- Client
- MTQ
- Architecture
- BGLA
- Landscape Architect
- EXP
- Structural Engineering
- EXP
- Mechanical Engineering
- EXP
- Civil Engineering
- EXP
- Electrical Engineering
- EXP
Présentation
Upgrading of the Point-du-Jour service area on Félix-Leclerc Highway. Demolition of existing buildings for the construction of a new 500 sq.m. service center as well as an additional building for water treatment. The building consists of a rest room, washrooms and technical rooms. Mechanical system characterized by geothermal wells to minimize energy costs. The structure of the building consists of a conventional steel frame and a concrete foundation laid on driven piles. Land with 100 parking spaces with multiple recreational features, a 26,000 sq.m. heavy truck stop. LEED certification is targeted.