Structural reinforcements - Central Station and Canora Station (REM)

Under construction
Delivery scheduled for 2025
To ensure the implementation of the REM, structural reinforcement work was carried out at the Central and Canora stations, as well as within the Mount Royal Tunnel. This work, which was performed in an existing environment, included the construction of steel elements and reinforced concrete supports, as well as complex excavations.

These structural reinforcements to existing installations are necessary for the commissioning of the REM through the Mount Royal tunnel. This includes steel reinforcements, strengthening of reinforced concrete arches, and the excavation of complex areas using custom-made steel trench boxes as well as rock pile drilling beneath existing structures. Strategic interventions at Canora Station and within the Mount Royal Tunnel are also included in the project, such as the installation of steel structures, construction of firewalls, and repair of concrete walls. Some of the work was carried out continuously (24/7) over several weeks. 

City
Montréal, Québec
Construction type
Works performed in an existing tunnel and rail stations
Sector
Civil
Work Type
Civil & Infrastructure
Construction method
Design and construction
Expertise
Design and pre-construction management
Gestion de projet
Procurement management
Prefabrication and modular construction

Technical sheet

Contract type
Cost-plus contract
Execution period
2024-2025
Client
CDPQ Infra
Structural engineering
Read Jones Christoffersen Ltd (RJC) | Géniflex (Tisseur)
Civil engineering
Géniflex
Similar projects

Agile execution,Solid foundations

We are an engineering and professional services company in Quebec. Our team of multidisciplinary experts works to create lasting impacts in the communities we serve. With a focus on innovation and integrity, we deliver high-quality projects.
Contact-us

Let's talk about your vision

Our team is here to bring your ideas and ambitions to life
Contact-us