Rue Alexandre School

Major extension of 3,385 m2 on 3 levels to minimize the footprint and provide greater outdoor space with play areas, relaxation areas and green spaces. The project also includes major interior redevelopment work in the existing part of the building, to bring the two projects together into a single school. The success of the project’s layout is based on fluid circulation that allows rapid access to the premises and floors, regardless of where users are in the building. A connecting corridor was designed to unite the existing with the new. Located only on the 2nd floor, it passes through the upper part of the gymnasium’s storage area without cluttering the rest of the floor space.
With modern facilities, new classrooms, a new sports arena with a stage that can be retracted as needed, and a large multi-purpose room that can create two spaces thanks to a removable partition, the Perséides school will accommodate around 400 local students, from preschool to grade 6. Several spaces will also be available for use by community organizations, including a solidarity space (troc counter).
One of the main challenges of the project was to design an extension without significantly reducing the schoolyard area. The project includes the addition of 5 regular classrooms, 10 kindergarten classrooms, a multi-purpose room and a double gymnasium. In addition, the building features impressive eco-responsible measures.
- City
- Laval, Québec
- Construction type
- Primary School
- Area
- 4,000m2 43,055 sq. ft.
- Capacity
- Around 400 students
- Exterior
Landscaped with a 53-space parking lot and a 2,700m2 schoolyard with several recreational features.
- Sustainable design
The building features impressive eco-responsible measures: MNÉB+20%, rainwater management, allowed natural ventilation, white roofing and geothermal heating.
Mechanical system featuring geothermal wells to minimize energy costs.
- Sector
- Institutional
- Work Type
- Buildings
- Expertise
- Gestion de projet
Technical sheet
- Contract type
- Lump-sum contract
- Execution period
- 2021-2022
- Client
- CSSL
- Landscape architect
- BMA
- Architecture
- VBGA+YWA
- Structural engineering
- Dubé Beaudry
- Mechanical engineering
- Stantec
- Civil engineering
- Dubé Beaudry

Agile execution,Solid foundations


)