Mont-Tremblant Sports Center
Design-build of a 2,060 m², 2-storey sports complex adjacent to the Centre collegial de Mont-Tremblant, featuring a double gymnasium, 200-seat bleachers, changing rooms, equipment storage, a 70-person capacity multi-purpose hall, an atrium, a reception area, and offices, all serving both the Centre collegial de Mont-Tremblant and the public.
Safety was a key priority in this project, particularly in terms of access control and video surveillance, to ensure a high level of security for all users while managing access to the adjacent Centre collégial.
The building structure composed of glued-laminated timber framing and structural concrete. The project was coordinated in 3D with Revit, using a collaborative approach involving the entire design team and subcontractors.

- City
- Mont-Tremblant, Québec
- Construction type
- Sports center
- Area
- 2,060 m2 - 22,175 pi2
- Capacity
- Double gymnasium measuring 35m x 26m with a 2m clearance on each side. ; 6 badminton courts, 6 pickleball courts, 3 basketball courts, 3 volleyball courts, 1 futsal soccer court, 2 ball hockey courts (cosom), 2 handball courts and 1 ultimate frisbee court. ; Bleachers seating for over 200 spectators ; Atrium ; 70-person multi-purpose room ; 2 changing rooms with showers and toilets
- Exterior
Landscaped site with an 81-space parking lot.
- Sector
- Institutional
- Work Type
- Buildings
- Construction method
- Design-bid-build
- Expertise
- Design and pre-construction management
Gestion de projet
Procurement management
Structural glulam


Technical sheet
- Contract type
- Design-Build contract
- Execution period
- 2021-2022
- Client
- City of Mont-Tremblant
- Landscape architect
- Lyne Legault
- Architecture
- NFOE
- Structural engineering
- CIMA+
- Mechanical engineering
- CIMA+
- Civil engineering
- CIMA+

Agile execution,Solid foundations


)