Strøm nordic spa, Piedmont

Under construction
Delivery scheduled for 2026
Project in 2 phases: Phase 1: Renovation of existing roofs; conversion of a building into a modern restaurant; construction of a new footbridge in a northern timber structure. Phase 2: The project involves the construction of two new pavilions: the reception building (Pavilion A), and the thermal treatments and experiences building (Pavilion B). Mixed wood, concrete and steel structure. Exterior landscaping in harmony with the natural setting.

Following the acquisition of Polar Bear's Club and Bagni Station Santé spas, Strøm Nordic Spa retained Tisseur’s construction management services for the redesign of its pavilions and overall site. The project was structured in two phases:

Phase 1 (2023):

Civil works: Construction of a new wooden footbridge spanning the Rivière du Nord. Our expertise in civil engineering and self-performed work enabled us to carry out this work during the winter period.

Building works: Refurbishment of 4 existing roofs with metal cladding and major renovation of a building to turn into a fine dining restaurant. Installation of a professional kitchen with adapted cooking and ventilation systems, and a warm, inviting dining area with views over the natural surroundings.

Phase 2 (2024–2026):

Accompaniment in design and construction of the new nordic spa.

The project includes the construction of two new pavilions: The main building (Pavilion A), with a surface area of 1,607 m², housing changing rooms and sanitary facilities.

Pavilion B, with a surface area of 770 m², offering various types of hot and cold pools, saunas, and relaxation areas.

Use of high-end, and noble materials. The structures feature a hybrid design combining wood, concrete, and steel. Outdoor layouts are carefully integrated to harmonize with the natural environment.

City
Phase 1: Piedmont, Quebec ; Phase 2 : Sainte-Adèle, Quebec
Construction type
Nordic spa
Area
2,500 m2 - 27,000 sq. ft.
Exterior

The site development includes outdoor pools, rest areas, terraces, walking paths, landscaping, civil infrastructure, mechanical and lighting systems, as well as a 400-space parking lot. Outdoor layouts are carefully integrated to harmonize with the natural environment.

Sector
Commercial
Work Type
Buildings
Construction method
Project management
Expertise
Design and pre-construction management
Procurement management
Gestion de projet

Technical sheet

Contract type
Construction Management (Guaranteed Maximum Price)
Execution period
Phase 1: 2023 Phase 2: 2024-2026
Client
Strøm spa
Landscape architect
Projet Paysage
Architecture
LemayMichaud
Structural engineering
CIMA+
Mechanical engineering
BPA
Civil engineering
Équipe Laurence
Electrical engineering
BPA
Similar projects

Agile execution,Solid foundations

We are an engineering and professional services company in Quebec. Our team of multidisciplinary experts works to create lasting impacts in the communities we serve. With a focus on innovation and integrity, we deliver high-quality projects.
Contact-us

Let's talk about your vision

Our team is here to bring your ideas and ambitions to life
Contact-us