Riverside Pool Cottage

35 Avenue, Lasalle

Project Summary

Cost
2 600 000$
Execution period
2016-1027
Type of contract
Contract
Client
City of LaSalle
Architecture
Poirier Fontaine
Structural Engineering
Beaudoin Hurens
Mechanical Engineering
Beaudoin Hurens
Civil Engineering
Beaudoin Hurens
Electrical Engineering
Beaudoin Hurens

Présentation

Complete demolition and reconstruction of the swimming pool and park cottage. Water basin of 25 meters long and 6 swimming lanes. The 285 sq.m. building is distributed on 1 level and include men and women changing rooms, some administrative premises as well as rooms housing the mechanical equipment for the operation of the pool. The building structure consists of a conventional steel frame. Landscaped land with a concrete beach.

Similar Projects

  1. Sainte-Marthe-sur-le-Lac Library

    Chemin d'Oka, Sainte-Marthe-sur-le-Lac
  2. Town Hall Chalet

    Place de la Mairie, Saint-Faustin-Lac-Carré 
  3. Saint-Eustache Hospital

    Bd. Arthur-Sauvé, Saint-Eustache

Make a Difference Every Day

Feeling that our thoughts, our ideas, our solutions make a difference is stimulating and energizing, isn’t it? We feel like going beyond limits, giving more, and reinventing ourselves constantly. At Tisseur, we create projects for the future, and a future jewel of Quebec. Does this vision appeal to you? Embark on this great adventure!

Find out more